To be used as Water steel pipe, Oil pipe and Gas pipe. All spiral welded seams are under Submerged Arc Welding for both inside and outside.
  • Machine Capacity : ND.6"- ND.144 " (ND.150 - ND.3,600 mm)
  • Production Capacity : 100,000 Metric tons / year
Step01
Steel Coil to Standard JIS G 3101 grade SS400 or as on request

Step02
Slitting Machine
to Divide Width of Steel Coil as Requirement



Step03
Forming
Spiral Forming Machine to from Spiral Steel Pipe by Tandem (2 Welding Heads) or 3 Welding Heads for Submerged Arc Welding for both inside and outside, DC/AC Method to get full penetration








Step04
End Expansion
Pipe End Expansion to form Spigot and Socket Ends









Step05
End Facing
Pipe End is being cut and bevelled at specified degree









Step06
Hydro Test
Pipe is under hydrostatic test at Spectified pressure









Step07
Blasting
Grit Blasting to SA 2.5 Standard or as on request

















Step08
Internal Painting
Inside Liquid Epoxy painting to AWWA C210 Standard min. 406 microns DFT.









Step09
External Coating & External Wrapping
External Coating to AWWA C222 Standard,consisting of PU (Polyurethane) & External Wrapping AWWA C214









Step10
Cement Lining
inside Lining shall be cement mortar in accordance with AWWA C205 Standard